This dream will unfold gradually and thoughtfully, shaped by the people who care about it most. We do not have all the answers—and that is intentional. The best version of this space will grow from community wisdom, need, and collaboration. We envision a Phased funding plan that allows the Living Earth Center to move with intentionality. What we do know is this: communities that invest in shared spaces, local food systems, and meaningful connection are communities better prepared to face whatever comes.
This dream will unfold gradually and thoughtfully, shaped by the people who care about it most. We do not have all the answers, and that is intentional. The best version of this space will grow from community wisdom, need, and collaboration. What we do know is this: communities that invest in shared spaces, local food systems, and meaningful connection are better prepared to face whatever comes.
Phase 1: Seed Phase
Secure the Property and Stabilize Existing Structures
Living Earth Center has closed on the Pohl Road property! Phase 1 covers buying the property and the immediate work needed to protect the site and prepare it for the future. Thanks to the generosity of our early supporters, LEC has raised, been pledged, or received in-kind gifts of more than $2.4 million. Phase 1 is fully funded, and the surplus is going to Phase 2.
Item | Amount |
Property Purchase (includes appraised price, closing costs, appraisal, survey, environmental studies, and legal fees) | $1,853,600 |
Barn Roof & Septic System | $75,000 |
First-Year Operating Expenses | $20,000 |
Campaign and Consulting Costs | $155,100 |
Total | $2,103,70 |
Status | Fully Funded ✓ |
Phase 2: Sprout Phase
Transition Growing Operations and Office Space While Expanding Programs
Phase 2 focuses on moving LEC's growing operations and offices to Pohl Road and laying the groundwork for long-term growth. This includes preparing the land for growing, preserving the historic barn, completing annexation into the City of Mankato, and turning the farmhouse into accessible office and meeting space.
Item | Amount |
Growing Onsite (landscaping, fencing, irrigation, equipment, restrooms, lighting, and part-time staffing) | $122,875 |
Barn Preservation (foundation repair, structural engineering, and electrical updates)* | $422,000 |
City of Mankato Annexation (assessments, annexation fee, sewer connection, parking, traffic study, stormwater, wetland reporting, and civil engineering) | $371,200 |
Farmhouse to Office (ADA updates, new furnace, asbestos abatement, furnishings, and technology)* | $270,000 |
Campaign and Consulting Costs | $165,600 |
Total | $1,351,675 |
*Costs marked with an asterisk are estimates and may change depending on building material costs at the time of construction.
Phase 3: Bloom Phase
Transform LEC into a Vibrant, Year-Round Community Destination
Our final phase is still taking root. We will shape it together with our staff, volunteers, gardeners, Emerging Growers, community partners, and neighbors, and the vision and its costs will change with the voices and needs of the community it serves. Based on what our partners have told us so far, we picture a space that includes:
- A restored and expanded historic barn for events, workshops, and conferences
- A commercial kitchen for educational workshops, events, and public use
- Public walking trails through prairie, woodland, and wetlands
- Expanded community gardens and a free food forest
- Indoor and outdoor learning spaces
- A children's garden and nature play area
- A farm stand featuring locally grown produce
- Deep-winter greenhouses and year-round growing spaces
- Innovative sustainability projects, including rainwater catchment and composting systems